25
Fri, Apr

Roules & Standards

Display:

Vessel owners/operators are required to comply with the U.S. ballast water regulations provided in Title 33 Code of Federal Regulations (CFR) Part 151, Sections 151.1510 or 151.2025. Upon a vessel’s compliance date, these regulations require use of one of the approved ballast water management methods listed in the regulations.

The Panama Canal Authority (ACP) issued an advisory announcing that, effective immediately, transiting crude oil tankers, product carriers, and chemical tankers carrying cargoes with flashpoints of less than 18°C are required to cool their main decks with water by means of the on-deck water sprinkler system or any other means available in order to prevent activation of their pressure relief valves during transit.

This guideline provides recommendations for the responsibilities, procedures and equipment required for LNG bunkering operations and sets harmonised minimum baseline recommendations for bunkering risk assessment, equipment and operations.
These guidelines do not consider commercial aspects of the bunker transfer such as Bunker Delivery Notes and measurement of quantity or quality of LNG.